# NASA — Artemis II mission animation

A 100-second CG animation that follows the Artemis II mission in order: rollout and launch from Kennedy, booster separation, Orion's checkout in Earth orbit, the trip around the Moon, re-entry and an ocean splashdown. It ends on the Artemis and NASA logos with no spoken or written explanation.

- Code: LN-0080
- Kind: Launch film
- Format: 3D animated story
- Brand: NASA Artemis
- Length: 100.0s · 22 beats · 13.2 beats/min · 20 hard cuts
- Industry: Hardware, Government
- Style: 3D render, Cinematic, Photoreal, No voiceover, Music-led, Slow and deliberate, One continuous camera
- Original: https://x.com/NASA/status/1889076057271132626
- Full breakdown: https://cutmap.co/v/nasa-artemis-ii-mission-animation

## The breakdown

The full breakdown has eleven sheets: Snapshot, Opening, Structure, Timeline, Rhythm, Look, Movement, Sound & words, Why it works, Production, Build brief. It is available to Cutmap Pro members at https://cutmap.co/v/nasa-artemis-ii-mission-animation.
