Analysed · 13 beats
00:00:00:00Beat 01 / 13 — Orb and sparks1280×720 · 30 fps
DM-0196 · UI motion filmWhat a Story

Infinity — Forget switching between tools

UI motion film · Light UI · Gradients · 19s

Make one like this
Length
19.1s
Beats
13· 0 hard cuts
Pace
40.9/min
Avg beat
1.5s

A 19-second UI-animation product demo with a voiceover and a music bed. App icons drift in around one line of type, a stock shot of a person at a desk dissolves into the product, and a hand cursor taps through five colour-coded views (Calendar, Columns, Gantt, List, Table). It ends on the logo, URL and a 'Get Lifetime Membership' button.

Product demoLight UIGradientsMorph transitionsPush-insVoiceoverMusic-ledFlat 2DDevice mockupsSaaSProductivity
Cut map — 13 beatsNo hard cuts · Click a beat to jump
00s05s10s15s
The breakdown — 11 sheetsMembers only
Loading the breakdown
Custom film

Want a film like this, made for you?

Framebox is the studio behind Cutmap. Send us this breakdown and your product, and we’ll quote for an original film built on the same structure.

Get a quote ↗

What a Story for Infinity · Watch the original ↗ · Measurements and analysis by Cutmap.