Analysed · 22 beats
00:00:00:00Beat 01 / 22 — Black1280×720 · 30 fps
LN-0080 · 3D animated story

NASA — Artemis II mission animation

3D animated story · 3D render · Cinematic · 100s

Length
100.0s
Beats
22· 20 hard cuts
Pace
13.2/min
Avg beat
4.5s

A 100-second CG animation that follows the Artemis II mission in order: rollout and launch from Kennedy, booster separation, Orion's checkout in Earth orbit, the trip around the Moon, re-entry and an ocean splashdown. It ends on the Artemis and NASA logos with no spoken or written explanation.

Launch film3D renderCinematicPhotorealNo voiceoverMusic-ledSlow and deliberateOne continuous cameraHardwareGovernment
Cut map — 22 beats┊ 20 hard cuts · Click a beat to jump
00s10s20s30s40s50s60s70s80s90s100s
The breakdown — 11 sheetsMembers only
Loading the breakdown
Custom film

Want a film like this, made for you?

Framebox is the studio behind Cutmap. Send us this breakdown and your product, and we’ll quote for an original film built on the same structure.

Get a quote ↗

NASA Artemis · Watch the original ↗ · Measurements and analysis by Cutmap.